|
The four holes with the nuts that were epoxied to the interior of the
main tube for the "GJD" refractor, have been plugged with small
cylindrical cones of painters tape (sticky side out) to prevent the infiltration of the
primer and paint during the finish application process. Without having
to show them, the same thing will be done to the holes for the
counterweight system. |
|