North Star II Field Tripod Construction - Fabrication of the Faceplates 4

 

A pair of opposing faceplates taped together to be drilled... (Click for enlarged view)

 

Stacked together in this photo we have two faceplates taped together in preparation to have the four mounting 5/16" holes drilled. These faceplates will be attached on opposite sides from on another on the "outer main leg supports". They will instill great strength to the NS II structural integrity, as well as a set on each leg being used to assist in height adjustment.