Jaegers 6" f/10 "GJD" OTA Construction - OTA Handles (marking location of OTA handle holes)

 

Engraving Main Tube in preparation to install the Handles - 8 (Click to see an enlarged image.)

 

After using a paper template (shown later) to establish the locations of the holes to be drilled for the OTA handles, I engraved spots on both sides of the OTA/ main tube. In doing so, this will help prevent the drill bit from wandering across the beautiful paint job when I commence to drilling the holes. Another option to curtail damaging the main tube's paint finish during drilling, would be to apply pieces of painters tape over the engraved marks.

To make certain that I install the two (2) OTA handles on the main tube in their respective locations opposite one another, in an inconspicuous location on the painted oak wood handle supports, and the on the main tube, I will mark one side with an "X", and the other with an "O", as you will see on the next couple of pages.