Jaegers 6" f/10 "GJD" OTA Construction - Main Tube (prepping for counterweight bar - 1)

 

Test aligning Sliding Counterweight Bar to drilled holes in Main Tube - 1 (Click to see an enlarged image.)

 

With the nuts for the Vixen dovetail bar securely epoxied to the inside of the main tube, I traversed to the objective end to begin the efforts for attachment of the Sliding Counterweight system. This counterweight system was manufactured by Celestron and was given to me by my friend and partner in astronomy, Gary Barabino.

Like the process used for attaching the nuts to the inside of the main tube for the Vixen dovetail bar, I will do the same for the Celestron counterweight bar. In this picture, the counterweight bar is positioned over the holes I drilled to which I will later epoxy the two (2) nuts to the inside of the main tube for its attachment.