Jaegers 6" f/10 "GJD" OTA Construction - Main Tube (prepping for a guide scope - 4)

 

Drilled holes for Guide Scope Bar - 4 (Click to see an enlarged image.)

 

Using a 1/4" bit, I completed drilling the four (4) holes in the main tube in preparation for installation of the Vixen dovetail bar. My attention will now go to the inside of the main tube where I will be epoxying four (4) nuts that will be used for connecting the dovetail bar, for which the guide scope will ride.