Jaegers 6" f/10 "GJD" OTA Construction - Main Tube (prepping for a guide scope - 5)

 

Drilled holes for Guide Scope Bar - 5 - Inside Tube (Click to see an enlarged image.)

 

Looking inside of the main tube in this image you will see four (4) hex bolts protruding from the holes made for attaching the Vixen style dovetail bar to the outside of the main tube. The bolts are there as a test to make certain they can fit through the holes once the nuts have been epoxied to the inside of the tube for securing the dovetail bar. Now let's prep the surface around each of the holes for adhering the nuts.